Planned maintenance on stal̕əw̓asəm Bridge means lane closures for drivers

Although the stal̕əw̓asəm Bridge between Surrey and New Westminster has been open to traffic for several months, planned maintenance has meant some delays for drivers who traverse the former Patullo span.

One southbound lane was closed Thursday (May 7) at 9 p.m. and will remain closed until Friday (May 8) at 9 p.m.

Over the weekend, lane closures in both directions will be in effect, with one lane scheduled to be closed in each direction from Friday night until Monday morning (May 11) at 5 a.m.

Drive BC encourages motorist to watch for traffic control as the maintenance work is being conducted.